Linen Chutes for a Three-Block Hospital
A general hospital in Egypt, supplied in 2014, arranged as three six-storey blocks with one linen chute in each. Soiled linen left the wards on the upper floors and had to reach the laundry without being carried through clean corridors or waiting on a service lift. The scope was the linen riser in each block: intake doors on all six levels, the discharge gate into the laundry receiving room, and the vent connection above roof level.
Design Advantages
A bag of waste drops fast and lands hard. Soiled linen is light, bulky and self-braking:
it rides the wall, tumbles, and will bridge across a bore that passes rubbish without
trouble. The consequence is that a linen bore is sized to the bundle a ward actually
produces, not to the weight of the load or the height of the building.
Linen arrives at the bottom to be counted, bagged and trolleyed into the laundry, so the
receiving room is a sorting space rather than a bin store. The discharge gate sits at
working height with clear floor in front of it, and the outlet drops into a trolley or bag
frame instead of a skip.
The riser terminates on the soiled side of the linen flow. Nothing that comes down the
chute passes through, or opens onto, the clean linen store, and the receiving room has its
own door to the service corridor. That is a planning decision taken before the first duct
section is set, and it is the reason the chute exists at all in a hospital.
The system runs on gravity. There is no fan in the riser, no motor at the gate and nothing
electrical inside the shaft, so the chute keeps working through a power isolation. The
only scheduled attention is the brush assembly and the door hardware.
Three blocks of six floors is a modest drop, and a modest drop is where bridging shows up
first: a bundle that tumbles free over fifty floors can come to rest in six. The 24-inch
(600 mm) bore leaves enough clearance for a full laundry bag to pass a half-filled one, and
every internal transition is a sweep rather than a step, so nothing slows a bundle enough
to stop it.
What QDCE Supplied
QDCE supplied the three linen risers, delivered to site:
- 18 intake doors, one per floor across three blocks, 510 x 510 mm
- SS304 duct sections, 24" (600 mm) diameter, 1200 mm and 600 mm lengths
- Wall brackets and expansion bolts for every section
- Fuse-linked discharge gates, 74°C (165°F), one per riser
- Vent connections above roof level
We build garbage chutes for residential towers. Not a catalogue item bolted to a wall — a shaft, a door on every floor, a discharge arrangement and a ventilation path designed together, because in a residential building those four things fail together.
Hotels usually need both lines: a hotel garbage chute for the guest floors and a hotel laundry chute for housekeeping, designed as one hotel chute system.
We supply the construction waste chute that takes debris off the floor while the building is still going up. HDPE sections light enough for two people to carry, a bracket that anchors to the slab, and a set your own crew installs and takes down as the work moves up.
Hospitals run two separate streams — a hospital garbage chute line for refuse, a hospital linen chute for soiled linen — and neither should be carried through patient areas. We build both to the same performance specification: hands-free intake, code-rated fire doors, and a shaft held under negative pressure.
A home laundry chute is a gravity chute that takes laundry from the upper floors to the laundry room, so nobody carries a basket down the stairs. In its standard form there is no power, no controls, and nothing to maintain beyond the door.